Dedicated Outdoor Air System Cost and Typical Prices 2026

Buyers typically pay $5,000-$45,000 for a Dedicated Outdoor Air System (DOAS) depending on capacity, zoning, and installation complexity. This article summarizes DOAS cost drivers, per-unit pricing, and realistic ranges to help U.S. buyers budget for equipment and installation.

Item Low Average High Notes
Small DOAS Unit + Basic Install $5,000 $12,000 $20,000 Single zone, 1-2 tons, simple duct tap
Medium Commercial DOAS (3-6 tons) $12,000 $25,000 $40,000 Multiple zones, energy recovery, moderate labor
Large/Custom DOAS (7+ tons) $30,000 $45,000 $85,000 High-efficiency ERV, rooftop curbs, controls
Controls/Commissioning $800 $2,500 $8,000 Advanced controls raise price

Typical Total and Per-Ton Prices for DOAS Installations

Most U.S. projects fall into a $5,000-$45,000 total price band, or about $1,200-$6,000 per ton depending on complexity and accessories.

Assumptions: Assumptions: standard commercial labor rates, moderate access, typical ERV option included where noted.

Typical small DOAS (1–2 tons): $5,000-$20,000 total, $2,500-$10,000 per ton. Typical medium DOAS (3–6 tons): $12,000-$40,000 total, $2,000-$6,500 per ton. Large or custom rooftop DOAS (7+ tons) with high-efficiency ERV and controls: $30,000-$85,000 total, $4,200-$12,000 per ton.

Breakdown of Major Quote Components for a DOAS Project

Materials Labor Equipment Permits Delivery/Disposal
$1,500-$30,000 (unit, ERV, filters) $1,000-$15,000 $500-$5,000 (rigging, crane) $100-$2,000 $100-$1,200

Materials and labor typically account for 70%–90% of the total DOAS price, with rigging/roof work and controls adding the largest single extras on rooftop installs.

Talk to a Local HVAC Pro & Lock In Your Savings
Call 877-693-2753
Fast quotes · Trusted installers · No-obligation estimate

Labor examples: small retrofit 10-20 hours at $75-$125 per hour; commercial rooftop requiring crane and crew 40-120 hours at $75-$125 per hour.

How System Capacity, ERV Selection, and Duct Runs Drive Price

Increasing capacity, adding energy-recovery ventilators (ERVs), or long new duct runs raises quotes significantly—expect step changes at 3 tons, 6 tons, and 10+ tons.

Numeric drivers: adding an ERV typically adds $2,000-$8,000; new ductwork costs $4-$12 per sq ft of conditioned area or $10-$25 per linear ft for trunk runs. If total system capacity rises above 6 tons, labor and structural support often add $5,000-$15,000 more.

Site conditions: rooftop curb and crane may add $2,500-$12,000; multistory shaft work or fire/smoke dampers add $1,200-$6,000.

Practical Ways To Reduce DOAS Price Without Sacrificing Performance

Control scope, choose standard efficiency ERV options, perform prep work, and schedule off-peak install dates to shave thousands off a DOAS quote.

  • Keep unit sizes near common capacities (3, 5, or 10 tons) to avoid custom pricing.
  • Opt for factory-mounted controls instead of fully custom BAS when budgets are tight.
  • Complete site prep (clear roof access, provide power stub) to reduce contractor labor hours.
  • Bundle DOAS with HVAC replacement projects to lower mobilization and permit fees.

Regional Price Differences and What To Expect Across the U.S.

Expect 10%–30% price variation by region: highest in urban West Coast and Northeast, lowest in parts of the Midwest and South.

Typical deltas: West Coast and Northeast +15%–30%; Sun Belt and Mountain West about ±0%–10% of national average; rural areas may be -5%–15% but add travel fees. Labor-rate examples: $95-$125/hr in high-cost cities vs. $65-$90/hr in lower-cost regions.

Common Add-Ons, Fees, and Hidden Costs To Budget For

Include $500-$12,000 extra for common add-ons like commissioning, controls integration, roof curbs, crane time, and permit upgrades.

Add-On Typical Range When It Applies
Commissioning $800-$4,000 New systems, energy code compliance
Rooftop curb & flashing $500-$3,500 Rooftop installations
Crane or rigging $1,000-$8,000 Large rooftop units or tight access
Controls integration $1,200-$8,000 Connecting to BAS or advanced scheduling

Three Real-World Quote Examples Buyers See in the Field

Concrete examples help translate ranges into likely bids for small, medium, and large projects.

Scenario Specs Labor Hours Per-Unit Rates Total
Small Office 2-ton DOAS, ERV, duct tap 12 $3,500 per ton $8,500
Retail Space 5-ton DOAS, new duct trunks, basic controls 48 $4,800 per ton $24,000
School Gym 12-ton rooftop DOAS, ERV, curb, crane, BAS link 120 $5,000 per ton $60,000

Assumptions: quoted totals include materials, typical labor, basic permitting, and local delivery; specialty site work may increase totals beyond shown ranges.

Talk to a Local HVAC Pro & Lock In Your Savings
Call 877-693-2753
Fast quotes · Trusted installers · No-obligation estimate